This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Winter warm up for London’s busiest airport

26 January 2015

Serving over 180 destinations in 85 different countries, the UK’s busiest airport prides itself on excellent customer service and employee satisfaction. Engineers and staff working on maintenance jobs around the airport are exposed to all that British weather has to offer, especially through the colder winter months.

This year, temperature control specialist, ICS Cool Energy, provided a temporary heating solution for four months to combat the cold ambient conditions and ensure staff could work at comfortable temperatures.

Russ Baker, Sales Director at ICS Cool Energy, explains: “Our engineers installed a rental package comprising eight 300kW Oil Fired Boilers, which were each individually paired with a powerful 300kW Air Handling Unit to four closed structure hangars which needed comfort heating.

“Due to the vast open space in each hangar, we recommended placing two boilers and two air handling units on each side of the hangar, in order to heat as much of the area as possible. The seasonal boiler package guaranteed that the hangars could be warmed up to 22°C, a comfortable temperature for the dedicated engineering and service personnel on site.”

ICS Cool Energy’s rental solution ensures that site operations can continue effectively throughout the winter months. The warmer environment also provides an ability to de-ice the aircraft engines where blades could otherwise freeze over. All ICS Cool Energy boilers ensure the airport complies with standard working temperature conditions as dictated by EU legislation.


Contact Details and Archive...

Print this page | E-mail this page

https://www.asckey.com/
https://www.bona.com/en/
PFM
https://www.aspenpumps.com/en-gb


MOST VIEWED...

View more articles
Article image

Why the Law Says You Need a Nappy Bin Disposal Service

At home, parents are used to disposing of their babies’ used nappies the same way they do any other domestic waste - bagging it up and sticking it in the r...
Article image

Making the Leadenhall Building fit for purpose

Firmly established as one of the most notable buildings in the City of London, the Leadenhall Building (informally known as the cheesegrater) provides a st...
Article image

YLOTY2018 winner comments on his success on the night

This year's PFM Awards Young Leader of the Year winner, Kristian Trend, gives his reaction winning the award after receiving his trophy on 7 November at Th...

Benchmarking maintenance

BSRIA has just published this year's operation and maintenance benchmarking report as a guide for building operators to evaluate their performance against ...
Article image

Can Far-UVC increase occupancy levels and reduce operating costs?

Despite the relaxing of government restrictions, the pandemic is not over. Many businesses themselves still feel nervous about bringing people back to work...
Article image

Account Director finalists confirmed for PFM Awards

Three finalists have been confirmed to attend the final day of judging within the PFM Partnership Awards 2022 Account Director of the Year category....
https://www.ppspower.com/
https://www.floorbrite.co.uk/
https://www.neccontract.com/products/contracts/nec4/facilities-management-contract/bundle?utm_source=PFM+ads&utm_medium=website&utm_campaign=PFM+ads
https://www.pfmawards.co.uk/
https://flowscapesolutions.com/
https://www.uhubglobal.com/
https://www.aspenpumps.com/en-gb
https://www.spacesolutions.co.uk/subservice/nec-contracts-management/