This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

TOUR & ANDERSSON PROVIDES SPECIALIST BALANCING SYSTEMS IN AUSTRALIA

16 April 2009

Tour & Andersson, the leading manufacturer of hydronic balancing valves, has recently installed its TA-H.U.B® (Hydronic User-friendly Balancing) system in a new 11-storey office building in Brisbane, Australia, where it has helped reduce the installation and commissioning time of valves in the building’s waterborne heating and cooling system.

The TA-H.U.B. is a bespoke system comprising a pre-insulated galvanised steel and aluminium unit. Within this is room for up to eight terminal units, complete with drain point, air vent, common measuring point and a flushing bypass.

To meet the requirements of the 11-storey office building in Brisbane, the TA-H.U.B system was installed with STAP differential pressure controls to monitor and control the interaction between valves on all floors, to maintain a constant pressure and flow of water around the HVAC system. The controls also allows the chilled beam circuits to work independently of each other meaning the system can be extended or converted in the future, without having to re-balance any part of it, and is unaffected by fluctuations in use on other floors of the building.

The TA-H.U.B technology was also specified with TBV-CM combined control and balancing valves, so that the flow of water to the chilled beams could be set and controlled by its periodical modulation, depending on temperature, ensuring the design flow is maintained.

Tour & Andersson’s TBV-CM modulating control valves allow specifiers to opt for variable flow HVAC systems. The valves combine control, balancing and measurement qualities, which can save on both cost and time when specifying a multiple valve installation.

Roger Briggs from Webb Australia Consultant Engineers specified the TA-H.U.B system to save on hardware costs, installation time and provide long-term maintenance savings.

By bundling hydronic balancing hardware into one unit specifying the TA-H.U.B. can reduce the overall cost of a waterborne system. Cost savings are not only related to labour and time spent on installation but also commissioning. The simplified fitting and commissioning of the TA-H.U.B. means that mechanical contractors spend less time on the job, delivering lower labour costs and helping main contractors to avoid time penalties across a construction project.

Webb Australia supplied Tour & Andersson with mechanical drawings detailing the proposed positions of the chilled beams. With help from Tour & Andersson’s Engineering Support Centre, a bespoke system was designed and installed that would service the needs of the building effectively.

For further information please contact Tour & Andersson on 01582 866377 or visit www.tourandersson.co.uk


Contact Details and Archive...

Print this page | E-mail this page

https://www.fsifm.com/en-gb/
http://edition.pagesuite-professional.co.uk/Launch.aspx?EID=64be7372-6bff-4efa-9323-0fdfb3a5c764


MOST VIEWED...

View more articles
Article image

Why the Law Says You Need a Nappy Bin Disposal Service

At home, parents are used to disposing of their babies’ used nappies the same way they do any other domestic waste - bagging it up and sticking it in the r...

Benchmarking maintenance

BSRIA has just published this year's operation and maintenance benchmarking report as a guide for building operators to evaluate their performance against ...
Article image

Collaboration key to achieving FM and real estate aims

An indirect route into his FM role has seen Chris Spratt discover a passion for the highly varied role and the benefits it provides to managing agents and ...
Article image

FSI at the Facilities Show 2019

Jon Clark provides an overview of the latest FSI introductions launched on the companies well-designed stand at the Facilities 2019....
Article image

Management buyout at Arcus FM includes independence from Sainsburys

Strategic investment has been secured to fund the management buyout of Arcus FM as the company seeks to further extend its £150m turnover business....
Article image

Technical issues delay CSCS card applications for employers

Online applications for Construction Skills Certification Scheme (CSCS) cards are continuing to take longer than expected, but waiting times are reducing, ...