This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

BSI Code on accessible buildings published

25 March 2009

BSI British Standards has published BS 8300: 2009 Design of buildings and their approaches to meet the needs of disabled people, a Code of Practice on the design of new buildings and adaptation of existing buildings to make them more accessible.

BS 8300: 2009 is applicable to a wide range of public buildings from car parks to concert halls and prisons to pubs. It addresses a wide range of disabilities and considers the usage by disabled people who can be residents, visitors, spectators, customers, employees, participants in sports events, performances and conferences or those involved in public life. Its recommendations are also likely to benefit non-disabled people such as the elderly, people with children in pushchairs and those carrying heavy luggage.

BS 8300: 2009 offers recommendations on the accessibility of the features around and within a building, including: access to lifts, wall surfaces, signage, wheelchair spaces in audience seating, arrangement of seating, reading carrels in libraries and accessible washbasins.

BS 8300:2009, which supersedes BS 8300:2001, explains how the built environment can be designed or modified to anticipate, and overcome, restrictions that prevent disabled people making full use of premises and their surroundings. Changes to the standard include: new sub-clauses on accessible baby changing facilities and changing facilities; more information on means of escape from a building and more references to BS 9999 Code of practice for fire safety in the design, management and use of buildings.

Mike Low, Director of BSI British Standards, said: "BS 8300: 2009 should provide an invaluable tool for those involved in the design of new buildings or in assessing the accessibility of existing buildings. It is one of several BSI standards addressing accessibility of some description, which has either been published or is in development."

Dr Patricia Pay, Chair of the BSI committee responsible for the development of BS 8300, said: "BS 8300: 2009 represents a significant stage in the continuous improvement of recommendations on the provision of accessible facilities for disabled people over the last thirty years. I am delighted that we have been able to draw on the expertise of committee members and those in the wider community with an interest in, and knowledge of, the needs of disabled people to provide advice on various aspects of design, and particularly on the design of specialized facilities catering for the sanitary needs of some of the most severely disabled people to enable them to play a fuller role in society."

The BSI committee responsible for developing BS 8300: 2009 was made up of representatives from disability charities, building trade associations and other professional bodies, academia and local government.


Contact Details and Archive...

Print this page | E-mail this page

https://www.fsifm.com
https://cleaningshow.co.uk/london


MOST VIEWED...

View more articles
Article image

Why the Law Says You Need a Nappy Bin Disposal Service

At home, parents are used to disposing of their babies’ used nappies the same way they do any other domestic waste - bagging it up and sticking it in the r...
Article image

Chris Jarvis appointed as MD for JR&Co

Julius Rutherfoord & Co (JR&Co) are delighted to announce the appointment of Chris Jarvis to the role of Managing Director....
Article image

Meeting the needs of the post-pandemic working environment

Changes driven by the impact of the Covid-19 pandemic is requiring software developers to update their offerings to meet the demands in the changing workpl...
Article image

Rinnai opens new office at The Building Centre in the heart of London

Rinnai, leader in low carbon hot water heating units and systems, is opening a new office and permanent exhibition in the renowned Building Centre in the h...
Article image

Extended service offering results from purchase of Cooltech

Ecoserv has announced it has purchased the Cooltech Environmental Engineering business in a deal worth £3.5m....
Article image

Property company enters administration with £1.4m debt

Despite receiving government support during the Coronavirus pandemic, property management company ARPM has gone into administration, it was reported earlie...
https://www.uhubglobal.com/
http://edition.pagesuite-professional.co.uk/Launch.aspx?PBID=78915b1c-0f11-4b5e-9468-ba601ad89761